The List of the projects provided below is not intended to be comprehensive, but rather to emphasize the diversity of work, which has been undertaken by
Global Hi-Tech (List-A)
and which has been undertaken by key / core team personnel’s prior to joining the present
Global Hi-Tech (List-B)
Activities
Feasibility & Survey
Project Management
Detailed Design
Proposal / Proc.Support
Construction Supervision
Lists
List A
|
Sr No |
Project Description |
Year |
Activities |
Remarks |
| BUILDING SERVICES | ||||
| 01 | Revamping THQ Hospital Kallur Kot – Bhakkar | 2017 | FS, PM, DD, PS | Work includes Architecture, Civil & Structure and MEP Design. |
| 02 | Revamping THQ Hospital Mankera – Bhakkar | 2017 | FS, PM, DD, PS | Same as above |
| 03 | Revamping THQ Hospital Khushab – Khushab | 2017 | FS, PM, DD, PS | Same as above |
| 04 | Revamping THQ Hospital Bhalwal – Sargodha | 2017 | FS, PM, DD, PS | Same as above |
| 05 | Revamping THQ Hospital Shahpur- Sargodha | 2017 | FS, PM, DD, PS | Same as above |
| 06 | Revamping THQ Hospital Fort Monroe – DG Khan | 2017 | FS, PM, DD, PS | Same as above |
| 07 | Revamping THQ Hospital Karor – Layyah | 2017 | FS, PM, DD, PS | Same as above |
| 08 | Revamping THQ Hospital Thal (Mian Nawaz Sharif Hospital) Layyah – Layyah | 2017 | FS, PM, DD, PS | Same as above |
| 09 | Revamping THQ Hospital Alipur – Muzaffargarh | 2017 | FS, PM, DD, PS | Same as above |
| 10 | Revamping THQ Hospital Rojhan – Rajanpur | 2017 | FS, PM, DD, PS | Same as above |
| 11 | Dar-Arqam School Main Campus, Khushab | 2016 | FS, PM, DD, PS | Work includes Architecture, Civil & Structure and MEP Design. |
| 12 | Burj Ismail Commercial Building, Sargodha | 2017 | DD, PS, CS | HVAC & Plumbing Design |
| 13 | Mega Brand Commercial Outlet, Lahore | 2016 | FS, PM, DD, CS | Architectural & Interior Design |
| 14 | Mueller & Phips Commercial Outlet, Lahore | 2017 | FS, PM, DD, PS | Architectural & Interior Design |
| 15 | Shakland developers Head Office, Lahore | 2017 | FS, PM, DD, CS | Architectural & Interior Design |
| OIL & GAS | ||||
| 01 | Material Estimation – Fire Fighting System Replacement at Al-Khafji Onshore Facilities. | 2017 | PS | Civil / Structural MTO’s have been prepared for EPC Proposal. |
| 02 | Electrical / Instr. Material Estimation Works for: 1. Phase-2, Bir Seba Field Development Project (Hassi Messaoud, Sahara Desert, Algiers. 2. Santos Roma Gas Field Development Project. 3. Sarsang Block – Wellsite-based production facility (WPF) – Kurdistan Iraq. 4. 5. | 2017 | PS | Complete Electrical / Instrumentations / Telecom Systems Material Estimation services have been provided for the submission of EPC Proposal. RFQs have also developed for getting quotations from various vendors. |
| PROJECT MANAGEMENT | ||||
| 01 | Head office Renovation Works – Haier Pakistan | 2017 | PS,CS | Architecture, Civil / Structure and MEP teams have been mobilized for the site supervision. |
List B
|
BUILDING SERVICES |
||||
| 01 | Upgradation of DHQ Hospital Sialkot to Teaching Hospital with total area of around 830,000 sq-ft. | 2017 | FS, PM, DD, PS | Detailed Design including Architectural, Structural, HVAC, Electrical, Public Health Engineering, Fire Fighting & Medical gases systems for Upgradation along with Tender Documents / Cost Estimates Preparation. |
| 02 | Punjab Agriculture, Food & Drugs Authority (PAFDA) Labs Projects with total area of around 200,000 sq-ft. | 2017 | FS, PM, DD, PS | Detailed Design including Architectural, Structural, HVAC, Electrical, Public Health Engineering, Fire Fighting & Medical gases systems for Upgradation along with Tender Documents / Cost Estimates Preparation. |
| 03 | Shaybah Residential Complex Project | PM, DD, PS | Shaybah expansion includes detailed engineering for the construction of three (3) new Residential Buildings complete with new HVAC, electrical & wiring, sewer & drainage, communication & cable television and firefighting & alarm systems. Also expansion of the existing utilities (Power, Fire / Potable Water, Communications, Sewerage Treatment) to cater for the new buildings. | |
| 04 | Specialized Medical Centre, Dammam, KSA | 2016 | DD | Detailed HVAC, Public Health & Medical gases system design. |
| 05 | Pediatric Hospital, Riyadh, KSA | 2016 | DD | Detailed HVAC, Public Health & Medical gases system design. |
| 06 | Saudi Food & Drug Authority HQ, Jeddah, KSA | 2016 | DD | Detailed HVAC, Public Health & Medical gases system design. |
| 07 | Ummul Qurrah University, Mecca, KSA | 2016 | DD | Detailed HVAC, Public Health & Medical gases system design. |
| 08 | King Fahad Hospital, KSA | 2017 | DD | Detailed HVAC, Public Health & Medical gases system design. |
| 09 | PINS Hospital, Lahore, Pakistan | 2012 | DD | Detailed HVAC system design. |
| 10 | LGH Hospital-Phase 3, Pakistan | 2012 | DD | Detailed HVAC system design. |
| 11 | PepsiCo Lays Factory, Lahore | 2012 | DD | Detailed HVAC system design. |
| POWER & ENERGY | ||||
| 01 | Design / Construction of Transmission Line / Substation Extension Projects: Fadhili Gas Plant. | 2016 | PM, DD, PS | Tendering, Engineering design and Procurement Services. |
| 02 | Design / Construction of Transmission Line / Substation Extension of: Cogeneration interconnection facilities at Hawiya Gas Plant. | 2016 | PM, DD, PS | Tendering, Engineering design and Procurement Services. |
| 03 | Design / Construction of Transmission Line / Substation Extension of: 69kV D/C in SAOO Up gradation project at Abqaiq with Saudi Aramco. | 2016 | PM, DD, PS | Tendering, Engineering design and Procurement Services. |
| 04 | Design / Construction of Transmission Line / Substation Extension of: OHTL 115 kV from Berri to Juaymmah Plant. | PM, DD, PS | Tendering, Engineering design and Procurement Services. | |
| 05 | Sharourah 50MW Power Plant Project | PM, DD, PS | Sharourah PP Saudi Arabia, with main scope of design/ engineering for BOP (Balance of Plant) including process, electrical & instrumentation, civil & structure, piping and mechanical design packages for the power plant. | |
| 06 | Power System Study for Berri Gas Cogeneration | DD | Power System Studies including Load Flow, Short Circuit, Motor Starting, Transient Stability & Relay Coordination were performed on ETAP. | |
| 07 | Consultancy for 500KV Moro Rahim Yar Khan / Jamshoro & Dadu Substations. | DD | Preparation of Proposals, Bid Evaluations, Design Review Services for Moro & Rahim Yar Khan 500 kV Substations & installation of 220/132 kV Auto-transformers at Dadu and Jamshoro Substations. | |
| 08 | PP-14 Power Plant, Riyadh, KSA | 2016 | DD | Detailed HVAC & Plumbing design. |
| 09 | PP-13 Power Plant, Riyadh, KSA | 2015 | DD | Detailed HVAC & Plumbing design. |
| 10 | PP-10 Power Plant, Riyadh, KSA | 2015 | PM, CS | HVAC, Fire Fighting & Plumbing Field Engineering and construction supervision. |
| 11 | Qurayyah Power Plant, KSA | 2013 | PM, CS | HVAC, Fire Fighting & Plumbing Field Engineering and construction supervision. |
| OIL & GAS | ||||
| 01 | Cogeneration Power Plants Interconnection facilities at Ras Tanura Refinery & Ju’aymah Plant | 2015 | PM, DD, PS | Feed & detailed design packages including all discipline (process, electrical & instrumentation, civil& structure, piping and mechanical) were developed for both plants. The projects provided the interconnection facilities to facilitate 3rd Party cogeneration trains for the supply of power and steam for the plants. |
| 02 | LPG Expansion Project at Yanbu Refinery | PM, DD, PS | The purpose of this project is to support Saudi Aramco corporate objective to efficiently meet the Kingdom’s demand for LPG. Feed package including all discipline (process, electrical & instrumentation, civil / structure piping, mechanical) was developed to upgrade the existing LPG facilities at Yanbu Refinery (YR) and Yanbu NGL (YNGL). |
In-Hand Projects
Global Hi-Tech Engineering Consultant’s (Pvt.) Ltd
The List of the projects provided below is not intended to be comprehensive, but rather to emphasize the diversity of work, which has been undertaken by Global Hi-Tech.
Sr No | Project | Client | Project Description |
| 01 | Us & Dynamo Textile Mill-Pakistan | Private | Detailed Design of Civil structure, Process piping HVAC, firefighting & plumbing |
| 02 | STC Central Warehouse, KSA | Private | Complete MEP Design. |
| 03 | Saudi Aramco Land Rigs Manufacturing Facility, KSA | Private | Complete MEP design for the project comprising of various buildings including workshops, warehouse & main office block with an approximate covered area of 500,000 sq. ft. |
| 04 | Aasia Allied Steel, Al Jubail, KSA | Private | Complete MEP design services for various auxiliary buildings with total estimated cooling capacity of 500 Tons. |
| 05 | Lukoil Substation Project, Iraq | Private | Complete MEP Design of substation located in Lukoil Facility Iraq. |
| 06 | Fauji Food Cheese Processing Plant Bhalwal | FAUJI Foods (Pvt) Limited | Deatiled HVAC and electrical system desgin of cheese proceesing and packaging plant |
| 07 | 132kV Substation Palm View Housing Scheme, Gujranwala | Aujla & Associates, Gujranwala, Pakistan | Complete substation design covering electrical & protection systems, HVAC and plumbing systems along with cost estimation and tendering support services for the Client. |
| 08 | 500 Bed Nishtar-II Hospital – Multan | Infrastructure Development Authority, Punjab (IDAP) | Detailed Design of HVAC, firefighting, plumbing and complete External electrical power systems. |
| 09 | 200 Bed Mother & Child Care Hospital – Mianwali | Infrastructure Development Authority, Punjab (IDAP) | Detailed Design of HVAC, firefighting, plumbing and complete External electrical power systems. |
| 10 | 150 Bed Cardic Hospital – DG Khan | Infrastructure Development Authority, Punjab (IDAP) | Detailed Design of Civil structure, HVAC, firefighting, plumbing and complete External electrical power systems. |
| 11 | Evercare Hospital Lahore | Private | HVAC System Rectification & Upgrade. |